Structural Works

Foundations, concrete frames, steel frames and transfer structures.

Delivery of the building’s structure — the part of the programme that sets the pace for everything that follows.

Operative in orange coveralls placing reinforcement on a deck, seen from above

01Scope

What is included

  • Piling and foundations
  • Basements and retaining structures
  • Reinforced concrete frames
  • Structural steel frames
  • Transfer structures
  • Temporary works

02Approach

Approach

  1. 01

    Plan the cycle

    Floor cycles are planned to the day and measured every week.

  2. 02

    Inspect before the pour

    Reinforcement, embeds and formwork are inspected and signed off before every pour.

  3. 03

    Design the temporary

    Temporary works are designed, checked and permitted like permanent works.

03Deliverables

What the client receives

Document register
Ref.Document
STR-001Structural cycle programme
STR-002Temporary works register
STR-003Pour records and cube results
STR-004Survey and tolerance records

04When to engage

When to engage

Delivered within VSN main contracts, and as a self-delivered package where it protects the programme.